Case studies
21 Moorfields
Deutsche Bank
£50M+
Apr 2022
Preparing to serve as the new UK HQ for Deutsche Bank, 21 Moorfields is currently under construction, with handover due in 2023. Fit-out of the building will follow with Deutsche Bank taking a phased occupation of the building on a floor by floor basis through 2024-25.
Affinity produced a responsibility matrix in respect of the fire safety responsibility requirements within CDM and HSG 168. Further we are providing construction phasing support in regards to the phased occupation, and will continue to provide construction support.
View Project Affinity produced a responsibility matrix in respect of the fire safety responsibility requirements within CDM and HSG 168. Further we are providing construction phasing support in regards to the phased occupation, and will continue to provide construction support.
JJ Mack Building
Helical
£50M+
Apr 2022
A 19,000 sq. m new build commercial office and ground floor retail development located in Farringdon, Central London, the JJ Mack Building is a high quality low environmental impact building over 10 floors and 2 basement levels.
Affinity provided fire strategy design advice including monte carlo time equivalence analysis of the structural fire resistance, through close coordination with Architects LDS and M&E L&P Group. We continued to provide ongoing support to MACE during construction.
View Project Affinity provided fire strategy design advice including monte carlo time equivalence analysis of the structural fire resistance, through close coordination with Architects LDS and M&E L&P Group. We continued to provide ongoing support to MACE during construction.